1. The Law Society is the representative body of over 141,000 registered legal practitioners in England and Wales. The Law Society negotiates on behalf of the profession and lobbies regulators, governments and others.
2. This submission has been prepared by the Law Society's Planning & Environmental Law Committee ('the PEL Committee'). The PEL Committee comprises 19 practitioners specialising in planning and environmental law, drawn from a cross-section of the profession, public and private sectors and covering both England and Wales.
3. The PEL Committee was pleased to have the opportunity to contribute to the development of the evidence base for the Planning (Wales) Bill ('the Bill') and to be represented on the Independent Advisory Group ('IAG'), whose recommendations have in large measure been adopted by the Welsh Government.
4. In February 2014, the Law Society responded to the consultation on the Welsh Government’s White Paper, Positive Planning: Proposals to Reform the Planning System in Wales and the draft Planning (Wales) Bill and the Environment and Sustainability Committee ('the Committee') is referred to that response in the report on consultation.1 The Law Society also gave evidence to the Committee’s pre-legislative scrutiny inquiry.
5. The Law Society welcomes this further opportunity to contribute to the debate by responding to the Committee's inquiry on the general principles of the Bill.
6. The Law Society notes that the Welsh Government has issued, in parallel with the introduction of the Bill, a series of consultations on proposals to exercise the powers proposed in the Bill and the Law Society will be responding to those consultations in due course. As a result, this submission has sought to confine itself to the provisions of the Bill and the underlying principles, but on occasion some discussion of future secondary legislation has proved unavoidable.
National Development Framework('NDF')
Strategic Planning
9. The Law Society considers that there are governance concerns about the strategic development plan panels ('SDP panels'). The argument for the introduction of a significant nominated element at this level of the development plan hierarchy does not appear to be fully developed. The Explanatory Memorandum at paragraph 3.31 refers to one third of an SDP panel comprising “representation from social, economic and environmental organisations”. The Bill2provides for nominated members of an SDP Panel to be appointed by the SDP Panel after they have been nominated by a “nominating body”. It is not clear whether the nominating bodies are to be other public bodies (for example, Health Boards) or non-governmental bodies. In the latter case, what assurance will the ministers be seeking with regard to their internal governance before adding them to the list of nominating bodies?
10. Paragraph 3.29 of the Explanatory Memorandum envisages that SDPs will enable "larger than local" issues which cut across several local planning authorities (such as housing demand) to be considered in an integrated and comprehensive way. SDP Panels will therefore be of great importance in addressing those “larger than local” issues that have, to date, proved to be intractable under the current arrangements (as shown by the evidence base). The Law Society questions whether the nomination arrangements as currently proposed are sufficiently robust and transparent to contribute to the standing of SDP Panels in the eyes of the public.
12. The Law Society considers that the Committee’s concern about the application of the competence framework to the nominated members is well made. However, this is another aspect of a problem identified by the IAG3, which pointed out that the member training has hitherto been focussed on the training of members to sit on development control committees and that, under the local authority cabinet system of government, the LDP is the responsibility of the cabinet. The development of a training and competence framework for members of the SDP Panels - whether elected or nominated - should be an early priority for the Planning Advisory and Improvement Service.
Part 3 - pre-application procedures
i. The Law Society recognises the designation of the types of development that will be subject to pre-application consultation, but questions whether basing the requirement on the existing definition of “major development”4 alone is sufficient. There are categories of development which, while not constituting “major development”, can nevertheless bring about significant change to their surroundings. Proposals for wind turbines are a case in point; the present publicity requirements for notifying neighbours of applications bear no relationship to the wide areas over which such vertical structures can be viewed. A more appropriate trigger might be the need for a screening under the Environmental Impact Assessment Regulations.
Part 4 - applications to Welsh Ministers and developments of national significance
15. The Law Society is generally supportive of the principles of the proposed system for determining applications for developments of national significance ('DNS') similar to that created by the Planning Act 2008 for Nationally Significant Infrastructure Projects (NSIPs), (albeit with some significant difference referred to further below). The projects covered by Part 4 of the Bill are of a size that would be considered 'nationally significant' (in the UK sense) and ought to benefit from a similar streamlined regime; although as the Law Society noted in its submission on the White Paper, the provisional list of schemes does not include significant highway schemes.
16. However, care must be taken that, when introducing a lower threshold for projects that already come under the Planning Act 2008 regime in Wales (principally electricity generation), this does not result in small projects having to go through an unduly onerous process for their size. Paragraph 3.71 of the Explanatory Memorandum states that energy generation projects in the range of 25-50 MW are proposed to be categorised as DNS in Wales. The Law Society is unclear as to the basis for this range; it is not explained in the Explanatory Memorandum or the White Paper for the Bill. The Law Society would suggest that this is a matter the Committee could usefully explore further.
17. Where DNS applications are made directly to the Welsh Government, there will need to be appropriate resources in place to handle them. The Bill makes provision for the Welsh Ministers to appoint persons to exercise functions in relation to DNS, including processing and deciding planning applications for DNS. The Explanatory Notes state that it is anticipated that such persons would be appointed from the Planning Inspectorate Wales. The Law Society welcomes the Welsh Government’s intention to maintain the Planning Inspectorate as a joint Wales and England agency. The Inspectorate now has experience of running over 50 applications in both Wales and England under the Planning Act 2008, supported by the extensive use of IT systems capable of handling large documents. This experience is of direct relevance to the proposed Welsh DNS system.
a. Would determining ancillary consent issues at national level within Wales facilitate greater co-ordination of decision-making?
b. If separate statutory provision is not made, would the Welsh Ministers consider calling-in ancillary consent applications under existing powers and, if so, is policy guidance on calling-in in such circumstances required or envisaged?
c. If call-in powers are to be used what might be the parameters? A potential example of a “greater than local” ancillary scheme meriting call-in could be the very large sub-station schemes connected with the export of wind energy from the TAN 8 strategic search areas. On the other hand, should applications for workers' housing required for a scheme remain with the local planning authority as a matter best determined locally?
20. The Law Society notes that the consideration of DNS can be by a combination of methods and the Explanatory Memorandum states that written representations and hearings are envisaged for these applications. This should enable the examination system used under the Planning Act 2008 to be largely replicated. However, there is no indication that there is an intention to replicate the use of a panel of “examiners” covering various disciplines, as under the Planning Act 2008, as opposed to a single inspector. The Law Society would suggest that the Committee could usefully seek further explanation of the Government’s thinking on this. It may be that the use of assistant planning inspectors is envisaged, but the Law Society thinks there is merit in providing for the appointment of a panel in appropriate cases.
Part 5 - Development Management
Part 6 - Enforcement and appeals
26. The Law Society welcomes the proposed changes to enforcement legislation set out in Part 6 of the Bill. These changes bring greater clarity and certainty to areas where there were some anomalies and omissions, and overcome some of the emerging differences between Welsh and English legislation where circumstances and objectives are similar.
27. Section 38 (inserting a new section 173ZA into the Town and Country Planning Act 1990) is welcomed. This provision should help to avoid unnecessary enforcement action where development is acceptable provided it has necessary controls imposed on it by way of conditions or limitations applied to a planning permission for development already carried out. It benefits those who have carried out development without permission, local planning authorities ('LPAs') and interested persons who could be affected by it in bringing forward an open and fair consideration of the acceptability of the development.
28. Sections 39 to 41 are supported as they prevent the anomaly whereby a deemed planning application was held to be made even where no appeal under ground (a) was made or argued. Moreover, they (together with section 30) provide a single avenue for seeking a planning permission and avoid the present duplication of process which leads to delay and uncertainty.
29. Section 42 has benefits for the decision-maker, LPA and interested persons in that it avoids legal pitfalls and simplifies the evidence gathering and presentation at appeal. However, it could delay what may, in the end, be an acceptable proposal by having it go through the process afresh.
30. Section 43 is welcomed and supported as it places appeals under section 215 of the Town and Country Planning Act 1990 in the most appropriate place for determination by those familiar with the issues that they involve.
31. Section 44 is welcomed in respect of the inclusion of the written representation format of appeal in the costs regime. This will undoubtedly assist in ensuring that the most appropriate format for determination of appeals is chosen. The Law Society also supports the ability of the Planning Inspectorate/Welsh Ministers to initiate and recover costs in appropriate circumstances, subject to the acceptability of the particular circumstances to be set out in secondary legislation. However, the Law Society would suggest that the Welsh Ministers should only be able to initiate an award of costs if there is unreasonable behaviour by one of the parties: they should not be able charge their costs to the parties on every appeal, whether or not there is unreasonable behaviour. As currently drafted, section 44 does not limit the Welsh Ministers' ability to initiate costs to cases of unreasonable behaviour.
Part 7 - Town and Village Greens
32. As stated in the Law Society's response to the Positive Planning consultation in February, applications for registration of a town or village green are frequently pursued in order to frustrate development that has been found acceptable in planning terms. Applications can be made at virtually no cost to the applicants and the non-statutory procedures for determining applications do not carry any costs sanctions against unreasonable behaviour. However, the costs to a landowner of challenging such an application can be very considerable and frequently have to be borne in order to protect an already significant investment in obtaining planning permission.
33. The Law Society welcomes the provisions made in the Bill to restrict the right to make an application where land has already entered the planning system and the inclusion of a provision that will enable landowners to submit declarations that their land is not being used "as of right". The Law Society supported similar proposals in England and maintaining consistency between England and Wales is helpful to practitioners and their clients.
The Welsh Language
iii. Is the degree of primacy to be afforded to Welsh in planning decisions compatible with other rights entrenching respect for family life and freedom of movement of individuals under human rights and European law?
Compulsory Purchase
35. The Law Society welcomes the Committee’s support for the IAG’s proposals in relation to bringing together compulsory purchase order ('CPO') powers applying in Wales.
36. There is also an aspect of the relationship between CPO powers and the proposed Welsh DNS system as it now appears in the Bill that merits further comment from the Law Society. Under the Planning Act 2008, a development consent order ('DCO') can contain CPO powers. The Welsh Government’s approach of keeping the Welsh DNS process squarely within the planning system precludes a similar approach to associated CPOs. In several of the categories of development proposed to be designated as nationally significant, there are existing CPO powers under other legislation. The normal approach to CPO is to satisfy Ministers that there are no obvious planning impediments to implementing CPO powers if granted. The result of this is a sequential approach where planning permission is in place before the examination of a CPO begins. The DCO approach of bringing CPO powers within the DCO examination process resolves this issue for schemes subject to the Planning Act 2008 system. The requirement to resolve potential planning impediments for other CPOs derives from circular guidance rather than being a statutory rule. The Law Society would suggest that the Welsh Government should examine how to enable NSP applications for planning permission and secondary consents to be considered in parallel with the granting of CPO powers where the applicant has such powers available and believes they are required for the scheme in question.
1 A copy of that submission accompanies this submission for ease of reference.
2 See Schedule 1, paragraph 4 and the new schedule 2A, paragraph 4 to the Planning and Compulsory Purchase Act 2004.
3 See IAG recommendation 64 and the preceding discussion.
4 Town and Country Planning (Development Management Procedure) (Wales) Order 2012, Part 1, paragraph 2 defines "major development" as: a) the winning and working of minerals or the use of land for mineral-working deposits(4); (b) waste development; (c) the provision of dwelling houses where— (i) the number of dwelling houses to be provided is 10 or more; or (ii) the development is to be carried out on a site having an area of 0.5 hectares or more and it is not known whether the development falls within sub-paragraph (c)(i); (d) the provision of a building or buildings where the floor space to be created by the development is 1,000 square metres or more; or (e) development carried out on a site having an area of 1 hectare or more;